Demolition of an exterior metal canopy as required to erect an enclosed corridor between the main school building and the Annex Building. Additional work included preparation and painting of the existing school building to include tuck pointing of masonry joints, patching and repairing masonry cracks and repainting window framing and insulated panels.
Owner: Chesapeake City Schools
Architect: RRMM Architects
|